View Categories

Commit Modified Graphics

Commit Modified Graphics

The “Spatial Engineer 11” tutorial on committing modified graphics is a vital guide for users who need to ensure that any graphical changes made to their network models—such as moving towers or adjusting fiber optic cable routes—are permanently updated in the database. This functionality is essential for maintaining the accuracy and integrity of the spatial data within Spatial Engineer 11. Here’s a summary of the key instructions and insights provided in the video:

  1. Importance of Committing Changes:
    • The tutorial emphasizes the critical importance of committing any graphical changes made to the plant to the database. This step is necessary to give the modified elements their new, intended positions and prevent them from reverting to their original locations during subsequent queries.
  2. Modifying and Moving Elements:
    • Demonstrating with an example, the presenter shows how to move a tower and modify the position of a fiber optic cable. These actions represent common tasks that might necessitate graphical adjustments within a project.
  3. Committing through the Feature Menu:
    • To commit these changes, users are instructed to access the feature pull-down menu and select “Commit Modified Graphics,” located about three-quarters of the way down. This action opens a dialogue that prompts the user to confirm the commitment of selected graphics to the database.
  4. Selecting and Committing Multiple Graphics:
    • The presenter points out that nothing was selected initially for the tower’s movement, demonstrating that multiple items can be updated simultaneously. By using a crossing window selection and right-clicking to commit all highlighted graphics, users can efficiently update several elements at once.
  5. Crucial Reminder on Saving vs. Committing:
    • A crucial distinction is made between simply saving a drawing file and committing changes to the database. The narrator stresses that saving a drawing file does not update the database; thus, any graphical modifications will not be visible to others accessing the database unless the “Commit Modified Graphics” function has been used.
  6. Closing Recommendations:
    • The video concludes with a reminder to always use the “Commit Modified Graphics” option after making any modifications to ensure that these changes are reflected in the database. This practice is essential whether working directly within Spatial Engineer 11 on queried features or from a saved drawing file.

This tutorial effectively guides users on how to properly commit graphical changes within Spatial Engineer 11, ensuring that all modifications are accurately reflected in the database for consistent and up-to-date spatial data management.

Keywords: Spatial Engineer 11, committing modified graphics, database updates, graphical changes, spatial data management, tutorial guide.